The most common method of payment in commercial building construction, in the traditional owner-contractor contract, is by monthly ____________________, which are partial payments for work completed during a portion, usually a month, of the construction period.
Fill in the blank(s) with the appropriate word(s).
progress payments
You might also like to view...
Which of the following start capacitors can replace one rated at 161–193 µF x 220 VAC?
a. 145-174 µF x 440 VAC b. 161-193 µF x 330 VAC c. 145-174 µF x 220 VAC
Refer to the figure. Determine J if the drawing measures 1-5/16"
Fill in the blank(s) with the appropriate word(s).
The _____ requires that labels on pesticides provide safety information for employers and employees.
Fill in the blank(s) with the appropriate word(s).
ASE-Style Multiple Choice Which of the following statements is LEAST-Likely true?
A. The terms topcoat and colorcoat refer to the paint applied over the primer-sealer coat. B. Compounding is the physical application of paint using an air pressure-powered paint spray gun. C. If the refinishing job looks good and the color matches well, the customer will usually be satisfied with all of the other repair work. D. Basecoat/clearcoat paint systems use a colorcoat applied over the primer-sealer with a second layer of transparent clearcoat over the colorcoat.