What are the three things to remember once we fix the system and confirm proper operation? Give an example of each.
What will be an ideal response?
? Put everything back in its place. Putting specialty tools and equipment
in its storage location, tools back in the tool box, etc.
? Finish the paperwork. Work logs, technician’s journal notes, logging
information on the computer, customer billing, warranty information.
? Deal with the parts used. Returning them for repair or warranty, disposing
of properly, ordering replacements as needed.
You might also like to view...
Each terminal in a controller is called a ____________________
Fill in the blank(s) with correct word
The most popular filler rods for brazing are ____________________ alloys
Fill in the blank(s) with the appropriate word(s).
Running your words together because you speak too fast is an element of:
a. bad articulation b. monotone c. creating excitement during a speech d. persuasive speech
In level 2 programming systems, the programmer ____________.
A. creates a new program, entering a string of points with proper motion labels, and tests the program for proper function B. writes the basic program offline with each position having a label, but no coordinate data C. enters the positional data for each axis as well as all the motion, processing, and data gathering commands to create a program D. physically alters something in the system to change functionality