In two weeks, 3 machinists assemble 30 machines.  How many machinists are needed to assemble 100 machines in the same times?

What will be an ideal response?


10

Trades & Technology

You might also like to view...

_____ is a moist substance wrapped around a girdled area

A) Sphagnum moss B) Electrician's tape C) Wax D) Cambium

Trades & Technology

A heat process that causes a change in a substance's temperature is called:

A) Latent heat. B) Total heat. C) Sensible heat. D) Specific heat capacity.

Trades & Technology

Because of ________, an ignition coil cannot be fully charged (reach magnetic saturation) until after a delay of about 10 ms (milliseconds)

A) Resistance in the coil windings B) Saturation C) Inductive reactance D) Voltage drop across the ignition switch

Trades & Technology

The duty cycle of an astable multivibrator is the ratio of time the output is ____________________ (low, high) to the total time of one cycle.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology