The Acme Class Ring Company designs and sells two types of rings: the VIP and the SST. They can produce up to 24 rings each day using up to 60 total man-hours of labor. It takes 3 man-hours to make one VIP ring, versus 2 man-hours to make one SST ring.How many of each type of ring should be made daily to maximize the company's profit, if the profit on a VIP ring is $20 and on an SST ring is $50?
A. 4 VIP and 20 SST
B. 0 VIP and 20 SST
C. 0 VIP and 24 SST
D. 12 VIP and 12 SST
Answer: C
You might also like to view...
Provide an appropriate response.Time is considered ordinary when each month is assumed to have 30 days.
A. True B. False
Graph the function.Assume it costs 25 cents to mail a letter weighing one ounce or less, and then 20 cents for each additional ounce or fraction of an ounce. Let L(x) be the cost of mailing a letter weighing x ounces. Graph y = L(x). Use the interval (0, 4].
A.
B.
C.
D.
Convert the function to the specified base. f(x) = x; convert to base 10
A. f(x) = 10x
B. f(x) = 10-7 log x
C. f(x) = 10-x log 7
D. f(x) = 10x log 7
Eliminate the parameter to obtain a Cartesian equation of the curve.x = , y = 3t + 4, 0 ? t ? 4
A. y = 4x2 + 3, -1 ? x ? 2 B. y = 3x2 + 4, 0 ? x ? 2 C. y = -4x + 18, 0 ? x ? 2 D. y = -4x2 + 18, 0 ? x ? 2