On-site changes in the original design that are made during construction are documented in the _____.

a. as-built drawings
b. takeoff sheet
c. project schedule
d. job specifications


a. as-built drawings

Trades & Technology

You might also like to view...

When constructing wall panels for a platform-framed structure, the wall panels _____.

a. are built in position b. are always placed using a crane c. are all framed before the first panel is raised d. are assembled on the subfloor

Trades & Technology

A(n) __________ frame minimizes twisting of the steering neck by having the upper frame tubes at a wide angle to the neck.

A. single cradle B. backbone C. double cradle D. perimeter

Trades & Technology

In a tilt-up wall building, the wall panels are precast on a concrete slab-on-ground, which is the first floor slab of the building. In some buildings, the first floor of the building is not a concrete slab-on-ground but an elevated slab. Explain how the tilt-up walls are cast in this type of building.

What will be an ideal response?

Trades & Technology

The objectives of the presentation should be stated by the presenter at the outset

Indicate whether the statement is true or false

Trades & Technology