List three of the four main pieces of information needed by the drafter in order to construct the fabrication details for a job?

What will be an ideal response?


To construct fabrication details, the CAD technician must have:
• Framing plans
• Sections
• Connection details
• Engineering calculation sketches

Trades & Technology

You might also like to view...

What is 7/8 x 2/5 x 1/2?

What will be an ideal response?

Trades & Technology

All of the following are components of a universal joint EXCEPT:

A. differential B. flange C. driveshaft D. transaxle

Trades & Technology

The ____ utility maintains program source code.

A. make B. patch C. gcc D. configure

Trades & Technology

An air conditioner with a thermostatic expansion valve is operating with a condenser saturation temperature of 95°F and a liquid-line temperature of 92°F. The factory-specified subcooling for the current operating condition is 10°F. The technician should:

A) Move some of the charge from the low side of the system to the high side of the system to balance the charge. B) Leave the charge alone because it is cooling even better than factory specifications. C) Add charge because the system is undercharged. D) Recover charge because the system is overcharged.

Trades & Technology