What are the two components of the cost of a transportation facility improvement? Describe each.

What will be an ideal response?


The cost of a transportation facility improvement includes two
components: first cost (also called initial cost) and continuing costs for annual
maintenance, operation, and administration. The first cost for a highway or transit
project may include engineering design, right-of-way, and construction. Design
parameters specific to each project will dictate which items will be required and
their costs. Maintenance and operating costs of the facility must also be
determined. These are recurring costs, or continuing costs, that will be incurred
over the life of the facility and are usually based on historical data for similar
projects.

Trades & Technology

You might also like to view...

One of the most important considerations that must be made before automating a process is _____.? ?  

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

For extinguishers greater than 40 lbs in weight, the top of the extinguisher can not be more than how many feet above the floor

A. 3½ feet B. 4½ feet C. 3 feet D. 4 feet

Trades & Technology

Graph the inverse CTFTs of these functions

Trades & Technology

Match the refrigerant cylinder with the correct color code.

A. orchid B. light blue C. green D. silver E. purple F. yellow orange G. white H. dark blue I. orange

Trades & Technology