A CPMT should include _____ who can oversee the security planning of the project and provide information on threats, vulnerabilities, and recovery requirements needed in the planning process.
A. business managers
B. human resource managers
C. physical plant managers
D. information security managers
Answer: D
You might also like to view...
The voltmeter scale has 100 divisions. The scale can be read to 1/5 of a division. Calculate the resolution of the instrument (each division represents a mm).
What will be an ideal response?
The first state in Europe to establish banks was
a. Florence. b. Genoa. c. the Papal States. d. Venice.
The heater circuit in a wide band oxygen sensor heats the sensor to about ________
A) 500°F B) 500 to 600°F C) 1,200 to 1,400°F D) 315°C
The following statements are all correct EXCEPT ________
A) Waste-spark systems use a signal from the PCM once the engine is running. B) Waste-spark systems do not need a timing signal from the PCM when cranking the engine. C) No ignition system uses the PCM to control ignition timing. D) Up-integrated ignition controls use the PCM to control ignition timing.