After unconscionability, what are the main attacks on the validity of an arbitration provision in a construction contract?
What will be an ideal response?
After unconscionability, the main attacks to the validity of an
arbitration provision in a construction contract are: “mutuality,” the
effect of termination of the underlying construction contract, or
frustration of the disputes process due to nonoccurrence of a
condition precedent to arbitration.
You might also like to view...
? more than 78.6 is 104.8.
Answer the following statement true (T) or false (F)
An industrial plant is supplied with high voltage power from the power company. The power lines are rated 13.8 kV. Express this value as volts.
Fill in the blank(s) with the appropriate word(s).
The auger required to run 3-1/2" PVC pipe through a wall is
Fill in the blank(s) with the appropriate word(s).
A(n) ____ transfers electrical energy from one circuit to another through its windings.
A. transformer B. inductor C. conductor D. magnet