Define construction survey.

What will be an ideal response?


A construction survey is performed at a construction site to locate the points and specify the elevations needed during the construction of structures.

Trades & Technology

You might also like to view...

The stimulus used to train a horse is called a(n) ____.

A. conditioned response B. cue C. mimicry behavior D. unconditioned response

Trades & Technology

Axial spray arc provides the highest metal transfer rate and that means higher productivity.

Answer the following statement true (T) or false (F)

Trades & Technology

All seeds require light to germinate

Indicate whether the statement is true or false

Trades & Technology

In a digital-to-digital conversion, the interface equipment formats the digital signal into a(n) ________ signal before transmitting it out onto the network

Fill in the blank(s) with correct word

Trades & Technology