The primary reference for mobile crane lift-planning policies and standards for use in the United States is _____.

a. OSHA Standard 29 CFR 1926 Subpart CC
b. ASME B30.5-2014
c. ASME B30.3-2014
d. ASME P30.1


d. ASME P30.1

Trades & Technology

You might also like to view...

A solar-powered personal aircraft with VTOL ca­pability has been under development for the past 30 years by a group of engineers and physicists. SPPAV, as the plane will be termed, is expected to be available for its final test flight in exactly 3 years from now. Over the previous 30 years, a total of $100 million has been spent in its development. Assuming the $100 million was spent in an equal amount each year, and assuming an interest rate of 10%, determine the following:

(a) The value of the total investment now, after the 30 years. (b) The value of the total investment at the ex­pected time of the final test flight in three more years, assuming the same amount is spent for each of the next three years. (c) The value of the total investment at the ex­pected time of the final test flight in three more years, assuming that twice the amount is spent for each of the next 3 years than that for the previous 30 years.

Trades & Technology

A(n) ____ can be connected to measure the velocity pressure of the air moving in a duct.

A. ammeter B. manometer C. pyrometer D. speedometer

Trades & Technology

To run a program in the background, append the ____ character to the end of the command used to start the program.

A. & B. * C. $ D. @

Trades & Technology

Using a paint pen to mark the final position of a nut after a torque inspection is a good means to determine if the nut loosens between maintenance cycles.

Answer the following statement true (T) or false (F)

Trades & Technology