Of the following, the primary consideration in the timing/scheduling of inspections should be:
A. the demands of the inspector's total work load.
B. to avoid costly delay for the builder.
C. the value of the structure being inspected.
D. the extent to which new materials are being used.
E. none of the above.
B
Trades & Technology
You might also like to view...
Which type of fuel cell is the most likely to be used to power vehicles?
A) MCFC B) PEM C) PAFC D) SOFC
Trades & Technology
The term _________________________ is generally used to refer to products used to repaint a vehicle.
Fill in the blank(s) with the appropriate word(s).
Trades & Technology
?Describe the operation of Honda's acceleration clutch.
What will be an ideal response?
Trades & Technology
When transplanting a plant cutting, the media must be kept as wet as possible to ensure proper root growth
Indicate whether the statement is true or false
Trades & Technology