Perform the indicated operation and simplify.
+ 
A. 1
B.
C.
D.
Answer: D
You might also like to view...
Obtain a slope field and add to its graphs of the solution curves passing through the given points.y' = 3(y - 1) with (2, 0)
What will be an ideal response?
Solve for y in terms of x.6 log 2 y - log 2 x = 2 log 2 7 + log 2 a
A. y = x + 14 + a
B. y = 1/6
C. y = 1/6
D. y = 1/6
Write the English phrase as an algebraic expression. Let the variable x represent the number.8 less than 4 times a number
A. 8 - 4x B. 8x - 4 C. 4x - 8 D. 4 - 8x
Solve the problem.A steel company produces two types of machine dies, part A and part B and is bound by the following constraints:? Part A requires 1 hour of casting time and 10 hours of firing time. ? Part B requires 4 hours of casting time and 3 hours of firing time.? The maximum number of hours per week available for casting and firing are 100 and 70, respectively.? The cost to the company is $0.75 per part A and $3.00 per part B. Total weekly costs cannot exceed $45.00.Let x = the number of part A produced in a week and number of part B produced in a week. Write a system of three inequalities that describes these constraints.
A.
B.
C.
D.