Solve.One conveyor belt can move 1000 boxes in 10 minutes. Another can move 1000 boxes in 6 minutes. If another conveyor belt is added and all three are used, the boxes are moved in 3 minutes. How long would it take the third conveyor belt alone to do the same job?
A. 15 minutes
B. minute
C. minute
D. 1 minutes
Answer: A
Mathematics
You might also like to view...
Find the compound amount for the deposit. Round to the nearest cent.$5700 at 5.5% compounded annually for 9 years.
A. $6013.50 B. $9736.42 C. $9228.84 D. $8521.50
Mathematics
Solve the equation.x = 5
A. x = 10 B. x = 2 C. x = 6 D. x = 7
Mathematics
For the given functions f and g, find the composition.f(x) = 7x2 + 5x; g(x) = 2xFind (f ? g)(x).
A. 28x2 + 10x B. 14x2 + 10x C. 7x2 + 7 D. 14x3 + 10x2
Mathematics
Solve the problem.A rug is to fit in a room so that a border of even width is left on all four sides. If the room is 17 feet by 24 feet and the area of the rug is 170 square feet, how wide will the border be?
A. 5.5 ft B. 6 ft C. 3.5 ft D. 4.5 ft
Mathematics