In a firm, fixed price contract, the contractor's profit is _____.
a. tied to project schedule performance b. subject to penalties and incentives c. negotiated separately from labor and material costs d. incorporated into the bid
What are the common types of preheaters that are used?
What will be an ideal response?
The bit rate is defined as ________
A) bits per second B) packets per second C) symbols per second D) half the baud rate
Which of the following is true when mounting a receiver-drier?
A. The refrigerant lines must be connected to the correct drier in and out ports B. The receiver drier must be installed in a vertical position or not more than 15 degrees from vertical C. The drier should be installed immediately after the protective caps have been removed D. All of the above statements are correct