Energy independent projects are referred to as ____, meaning that they are not connected to electric and natural gas utilities.

A. off-grid
B. grid independent
C. external-to-grid
D. out of grid


Answer: A

Trades & Technology

You might also like to view...

Which tree is recognized by its star-shaped leaves and distinctive ball-shaped fruit?

a. hickory c. cherry b. black walnut d. sweetgum

Trades & Technology

Which Italian city was the third largest in Europe in 1800, with a population of over 350,000?

a. Venice b. Florence c. Rome d. Naples

Trades & Technology

Non-servo robots most often have pneumatic actuators driven by compressed air

Indicate whether the statement is true or false

Trades & Technology

Wire type THWN copper is run in a raceway from a wall outlet in a building under concrete floor where the conduit is in contact with the earth. The walls are exposed on both sides to free air. If the load requires a minimum wire rating of 75 A, the minimum wire size permitted is ____ AWG.

A. 4 B. 6 C. 8 D. 10

Trades & Technology