A collision repair technician is overhauling a bumper assembly. All of the following will be included in that process EXCEPT:

A. Taking the bumper completely apart.
B. The price of a new energy absorber.
C. Inspecting each and every part of that assembly.
D. Cleaning the reusable bolts.


B. The price of a new energy absorber.

Trades & Technology

You might also like to view...

There is a new requirement that supply-side bonding jumpers must be protected by the same means as for ____________________.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

When a furnace tube or section of refractory gets too hot:

a. flame impingement b. scorching c. hot spot d. shock bank

Trades & Technology

The noise criteria (NC) rating system used to rate the sound levels of registers and grilles is:

A) A subjective scale ranking registers from 1—10. B) Based on graphical analysis of standing pressure waves. C) The average decibel reading of five specific frequencies of sound. D) The decibel reading at a frequency of 1,500 Hz.

Trades & Technology

During valve overlap what takes place?

A. The compression and power strokes. B. Maximum compression pressure. C. Compression ignition and fuel injection. D. Expelling of end gases and cooling of the piston crown.

Trades & Technology