The ____ used with poured- in-place concrete floor systems consist of a plan view of the floor, sections, slab schedules, and notes.

A. engineering drawings
B. slab drawings
C. placing drawings
D. floor grid drawings


Answer: A

Trades & Technology

You might also like to view...

List and describe five different types of energy conversion.

What will be an ideal response?

Trades & Technology

In the ____ position, the pipe is rolled either continuously or intermittently so that the weld is performed within 0 to 15 degrees of the top of the pipe.

A. Horizontal rolled 1G B. Horizontal fixed 5G C. Vertical 2G D. Inclined 6G

Trades & Technology

Rubber cushioned screwdrivers can _______ be used on "Live" circuits

A. Always B. Never C. Sometimes D. If marked electrically insulated for live circuits

Trades & Technology

The number of counts or states through which a counter progresses before returning to its original state (recycling) is called the ____________________ of the counter.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology