Using the results for Problems 8-16 and 8-19, compare the two different approaches used for computing cycle length.
What will be an ideal response?
The HCM method (used in Problem 8-19) is less computationally
intensive than Webster method (used in Problem 8-16). The HCM method allows
for a desired v/c ratio to be a determining factor in cycle length. Webster’s
method yielded a cycle length of 11 seconds longer than the HCM method.
You might also like to view...
If soil pH is 5.0 or higher, fertilize with ammonium sulfate to lower the pH
Indicate whether the statement is true or false
All of the following are advantages of product departmentalization except
a. all activities for one product can be kept together. b. decision making is faster. c. administrative costs are lower. d. monitoring the performance of individual product groups is easier. e. all of these are advantages of product departmentalization.
PROBLEM 3.104The shaft AB is made of a material that is elastoplastic with ?Y ? 90 MPa and G ? 30 GPa. For the loading shown, determine (a) the radius of the elastic core of the shaft, (b) the angle of twist at end B
How many faces or edges are parallel to the picture plane in three-point perspective?
a. One b. Two c. Three d. All four e. None