Causing a delay to a subsequent activity is called
A) free float.
B) designated slack.
C) reduced slack.
D) total float.
A
You might also like to view...
Which of the following is one of the other stimuli present in a buyer's environment apart from a marketing stimuli?
A) product stimuli B) cultural stimuli C) price stimuli D) place stimuli E) promotion stimuli
Which of the following are easy to trace to individual jobs?
A) direct materials and overhead B) direct materials and direct labor C) direct labor and overhead D) overhead and indirect labor E) depreciation on machinery and indirect labor
______ is a technique used to optimize an objective (such as maximizing profits or minimizing costs) under certain constraints, such as availability of resources.
A. Integer programming B. Assignment method C. Linear programming D. Workflow optimization
A typical capacity for an oil supertanker would be approximately?
a. 500,000 barrels b. 1,000,000 barrels c. 2,000,000 barrels d. 40,000,000 barrels