When students are involved in developing their own scoring rubric for a project, which of the following is most likely to result?
a. Control is transferred from the teacher to the student.
b. Students create a rubric on which it is much easier to obtain a high grade than if the teacher had developed it.
c. Students take ownership in the project.
d. Students are less likely to cheat on the assignment.
e. Performances of students are weaker, but they will enjoy the assignment more.
C
You might also like to view...
Answer the following statement(s) true (T) or false (F)
Editing and proofreading are similar and interrelated when it comes to the editing stage of the writing process.
Organizing and managing time, materials, and space for facilitating a smooth and efficient classroom is part of
A. school codes of conduct. B. disciplinary procedures. C. a teacher's contract. D. a teacher's management responsibilities.
In a research study, which of the following could not serve as a dependent variable?
a. reading test score b. age in months c. performance on a physical task d. measure of anxiety
Time spent in front of a computer screen or television is often called tech time.
Answer the following statement true (T) or false (F)