Subtract.5 - 

A. 6
B. 16
C.
D.


Answer: B

Mathematics

You might also like to view...

Solve the problem.A company produces three types of bookcases: 4-shelf metal, 6-shelf metal, and 4-shelf wooden. The 4-shelf metal bookcase requires 2.5 hours for fabrication, one hour to paint, and one-half hour to package for shipping. The 6-shelf bookcase requires 4 hours for fabrication, 1.5 hours to paint, and one-half hour to package. The wooden bookcase requires 3 hours to fabricate, 2 hours to paint, and one-half hour to package. The daily number of hours available for each phase of production are: 167 for fabrication, 81 for painting, and 26 for packaging. How many of each type of bookcase can the company produce in one day?

A. 16 4-shelf metal, 16 6-shelf metal, and 20 4-shelf wooden B. 14 4-shelf metal, 18 6-shelf metal, and 20 4-shelf wooden C. 16 4-shelf metal, 18 6-shelf metal, and 18 4-shelf wooden D. 14 4-shelf metal, 16 6-shelf metal, and 18 4-shelf wooden

Mathematics

Evaluate the expression.(53)

A. 20 B. 1 C. 10 D. 5

Mathematics

The graph of a function is sketched as follows: ? ? Determine the interval on which the function is decreasing.

What will be an ideal response?

Mathematics

Find the area under the normal curve.Find the percent of the area under a normal curve between the mean and 3.01 deviations from the mean.

A. 49.86% B. 99.87% C. 50.13% D. 49.87%

Mathematics