For a public works project, changes may not be made to any of the documents during which of the following phases?

A. After bid opening, but before award of the contract.
B. Before opening of bids, but after advertising for bids.
C. After bid opening, but before signing of the agreement.
D. After award of the contract, but before signing the agreement.


C

Trades & Technology

You might also like to view...

Steam turbine engines were an important development in the late 1800s because ____

a. they operated with a low pressure system that was safer than what was used before b. their spinning action was almost soundless c. they allowed boats to travel at speeds over 100 knots d. they became the main source of electricity production in the U.S.

Trades & Technology

A binary counter is a digital circuit that uses flip-flops connected together to produce a sequence of states representing binary numbers

Indicate whether the statement is true or false

Trades & Technology

What is the maximum pressure acetylene regulator gauges should be set at?

A. 15psi (100kPa) B. 30psi (200kPa) C. 100psi (700kPa) D. 10psi (70kPa)

Trades & Technology

It is most important to start biosecurity measures at the federal level.

Answer the following statement true (T) or false (F)

Trades & Technology