____ are often used in place of finished drawings, particularly when time and circumstances do not permit preparation of a finished drawing.
A. Drafts
B. Mockups
C. Guides
D. Sketches
Answer: D
You might also like to view...
The Nullification Crisis of 1832-1833 erupted directly over
A. banking policy. B. internal improvements. C. tariff policy. D. extension of slavery into the western territories. E. Indian policy.
The tendons used for prestressing a PT concrete slab-on-ground generally consist of
A) two-strand tendons, each strand made of seven wires. B) a single 1/2-in.-diameter, seven-wire strand. C) a single 1/2-in.-diameter, nine-wire strand. D) three -strand tendons, each strand made of seven wires. E) none of the above.
The height of an inaccessible mountain peak, C, in Figure 4.14 must be estimated. Fortunately, two smaller mountains, A and B, which can be easily scaled, are located near the higher peak. To make matters even simpler, the three peaks lie on a single straight line. From the top of mountain A, altitude 2.000 × 10^3 m, the elevation angle to C is 12.32°. The elevation of C from mountain B is 22.73°. Mountain B is 1.00 × 10^2 m higher than A. The straight line (slant) distance between peaks A and B is 3.000 × 103 m. Determine the unknown height of mountain C.
In a larger plant with more employees, technicians might be ________.
A) More specialized B) Required to work on slippery walkways C) Required to work indoors and outdoors D) Required to perform more physically demanding work