Solve the problem.A contractor mixes concrete from bags of pre-mix for small jobs. How many bags with 8% cement should he mix with 3 bags of 20% cement to produce a mix containing 12% cement?

A. 14 bags
B. 8 bags
C. 6 bags
D. 9 bags


Answer: C