One of two basic types of drawings cutting through an entire building or structure, ____ cut across the entire width of a building.

A. longitudinal sections
B. cross sections
C. lengthwise sections
D. lateral sections


Answer: B

Trades & Technology

You might also like to view...

A stall test is used to check the ________.

A) Turbine B) Impeller C) Stator D) Torque converter clutch

Trades & Technology

Which of the following symptoms is common in healthy rats?

a. Piloerection b. Red tears or red sneezes c. Frequent sneezing d. Sitting hunched, away from cage mates

Trades & Technology

After chemically cleaning a condenser, it is extremely important to make sure that the chemicals are neutralized or the tubes may be damaged.

Answer the following statement true (T) or false (F)

Trades & Technology

What is the first step of the diagnosis process?

A) Verify the problem B) Check for technical service bulletins C) Retrieve the diagnostic trouble codes D) Look at scan tool data

Trades & Technology