Which of the following statements is true?
A) Posttensioning is generally done at the precaster's plant and yields a precast, posttensioned concrete member.
B) Pretensioning is generally done at the construction site and yields a precast, prestressed concrete member.
C) Pretensioning is generally done at the precaster's plant and yields a precast, prestressed concrete member.
D) Posttensioning is generally done at the construction site and yields a precast, posttensioned concrete member.
C) Pretensioning is generally done at the precaster's plant and yields a precast, prestressed concrete member.
You might also like to view...
What may happen if the knock sensor system provides excessive spark retard?
What will be an ideal response?
The critical path method is like a ____ for the project.
A. flowchart B. bar graph C. text summary D. line graph
In some hybrid electric vehicles, the wide band oxygen sensor can cause the PCM to enter closed loop ________
A) Within 10 seconds of engine (ICE) start-up B) Within 2 minutes C) By the time the vehicle reaches 60 mph D) As soon as the engine (ICE) starts
What is the blanching process and why should it be used before freezing vegetables?
What will be an ideal response?