Which of the following statements is true?

A) Posttensioning is generally done at the precaster's plant and yields a precast, posttensioned concrete member.
B) Pretensioning is generally done at the construction site and yields a precast, prestressed concrete member.
C) Pretensioning is generally done at the precaster's plant and yields a precast, prestressed concrete member.
D) Posttensioning is generally done at the construction site and yields a precast, posttensioned concrete member.


C) Pretensioning is generally done at the precaster's plant and yields a precast, prestressed concrete member.

Trades & Technology

You might also like to view...

What may happen if the knock sensor system provides excessive spark retard?

What will be an ideal response?

Trades & Technology

In some hybrid electric vehicles, the wide band oxygen sensor can cause the PCM to enter closed loop ________

A) Within 10 seconds of engine (ICE) start-up B) Within 2 minutes C) By the time the vehicle reaches 60 mph D) As soon as the engine (ICE) starts

Trades & Technology

What is the blanching process and why should it be used before freezing vegetables?

What will be an ideal response?

Trades & Technology

The critical path method is like a ____ for the project.

A. flowchart B. bar graph C. text summary D. line graph

Trades & Technology