The first step in the PLD programming process is ________

A) compilation B) download C) synthesis D) data entry


D

Trades & Technology

You might also like to view...

What is the best way to test your vehicles low air pressure warning signal?

Trades & Technology

An automobile traveled 2,974.4 km and used 70.4 L of fuel. How many kilometers was the auto able to travel on each liter?

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

__________ place a disk or similar shape in the fluid and use the force of the fluid flow to deflect the disk and generate a signal.

A. Turbine flowmeters B. Target flowmeters C. Sail flowmeters D. Magnetic flowmeters

Trades & Technology

The first step in starting a chilled water system is to ____.

A. activate the compressor unloading system B. activate the chilled water circulating system C. activate the condenser heat removal system D. start the compressor operation sequence

Trades & Technology