The start windings have ____.
A. fewer turns than the run windings
B. more turns than the run windings
C. the same number of turns as the run windings
D. larger diameter wire than the run windings
Answer: B
You might also like to view...
____ floors are a green building technology that combines the mixture of sand, clay soil, and fibers that are poured in place and sealed with linseed oils and waxes to make durable washable surfaces.
A. Natural B. Stone C. Composite D. Earthen
In a process called _____________________, bacteria are produced in enormous quantities
Fill in the blank(s) with correct word
A product has a standard deviation of demand of 15. The safety stock for a service level of 98% would be approximately:
A) 15. B) 14.7. C) 26. D) 31. E) 8.
Craft workers use plaster-base panels instead of typical gypsum boards as a base for plaster wall designs because ________
A) Plaster-base panels are moisture-resistant B) Plaster-base panels work with plaster finishes C) Plaster-base panels are used in wet areas D) Plaster-base panels are used for backing with ceramic tile