What should a process technician do first with rainfall buildup in a containment wall?

A) Open a valve and drain the liquid
B) Test the water to ensure it is free of contaminants
C) Leave the rainwater to cool off the containment wall
D) Use a new containment wall


Answer: B
Explanation: A) Incorrect. The rainfall buildup must be tested to be free of contaminants prior to draining.
B) Correct. The rainfall buildup must be tested to be free of contaminants prior to draining.
C) Incorrect. The rainfall buildup must be tested to be free of contaminants prior to draining.
D) Incorrect. The rainfall buildup must be tested to be free of contaminants prior to draining.

Trades & Technology

You might also like to view...

The Hudson River school excelled in the art of painting

A. portraits. B. classical frescos. C. still life. D. daguerreotypes. E. landscapes.

Trades & Technology

If 100 lbs. of force is applied to 1 sq. in. of area, how much fluid pressure is created?

A) 100 lbs B) 10 PSI C) 1 PSI D) 100 PSI

Trades & Technology

The high-strength steel cables used in posttensioned concrete construction are called _____.

a. stringers b. bands c. tendons d. stays

Trades & Technology

Polish remover in salon to use on customers who wear nail tip or acrylic is:

What will be an ideal response?

Trades & Technology