In the CMAR method of project delivery, the CM

A) advises the owner in the selection of the architect and the design team members.
B) advises the design team with respect to the constructability of design decisions and their
cost implications.
C) works as the general contractor for the project.
D) only A and B
E) only B and C


E) only B and C

Trades & Technology

You might also like to view...

How does one write a program in a Level 4 robotic system?

What will be an ideal response?

Trades & Technology

How can the Tape Measure tool be used to create a guide point, as opposed to a guide line?

What will be an ideal response?

Trades & Technology

In the accompanying figure, the item identified as number 2 is the ____.

A. line of sight B. top view C. lines of projection D. front view

Trades & Technology

What type of maintenance program approach involves conducting maintenance tasks on a set schedule to keep failures from happening?

A) Corrective B) Preventive C) Predictive D) Detective

Trades & Technology