Which phase of the construction workflow requires the contractor to determine the work requirements?

a. Bidding
b. Construction
c. Pre-construction
d. Closeout


a. Bidding

Trades & Technology

You might also like to view...

____________________ indicate the locations where components of the part should be placed, assembled, machined, or welded.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

A ____ dome is a spherical shell structure based on a network of triangular elements that provide triangulated rigidity and distribute stresses across the entire structure.

A. space frame B. pneumatic C. fabric D. geodesic

Trades & Technology

What law says employers must provide information about hazardous materials used in the work place?

A) OSHA B) RCRA C) EPA D) Right to know

Trades & Technology

A computer screen that quickly provides the user with detailed information on the various types of energy consumed at a facility is called a ________________

A. log in screen B. energy dashboard C. retro-commissioning screen D. all of the above

Trades & Technology