The capacity available with no regard for downtime, utilization and efficiency is:

A) theoretical capacity. B) measured capacity.
C) finite capacity. D) available time.


A

Trades & Technology

You might also like to view...

What is required by the symbol shown in Figure 1?

a. Pre-weld testing on the other side of the joint
b. Pre-weld testing on the arrow side of the joint
c. Post weld testing on the other side of the joint
d. Penetrant testing on the arrow side of the joint
e. None of the above

Trades & Technology

What welding procedure is to be used at joint H?

What will be an ideal response?

Trades & Technology

All welding machines are capable of providing both CP and CC welding currents.

Answer the following statement true (T) or false (F)

Trades & Technology

Technician A says that flushing the brakes is the removal of air from the system. Technician B says that bleeding the system is the complete replacement of all system brake fluid with new fluid. Who is correct?

A. A only B. B only C. Both A and B D. Neither A nor B

Trades & Technology