Which of the following represents a major difference between a scheduled receipt and a firm planned order?
A) The scheduled receipt is generated from the master schedule, the firm planned order generated from MRP.
B) Only the scheduled receipt can occur within the planning horizon.
C) Only the scheduled receipt represents a financial commitment.
D) The computer can move the scheduled receipt, not the firm planned order.
C
You might also like to view...
Gasoline fumes are which of the following?
A. Lighter than air B. Less flammable than liquid gasoline C. Safe to breath D. Heavier than air
Which of the following may be used for water supplies, compressed air, and residential gas distribution??
A. Low-pressure piping systems? B. Medium-pressure piping systems? C. Seamed pipe? D. Spiral pipe?
What type of flame proving do direct spark ignition controls use?
A) Thermocouple B) Warp switch C) Flame rectification D) Mercury filled bulb
What component connects the steering gearbox to the steering linkage?
A. idler arm B. pitman arm C. steering shaft D. tie-rod