Useful resources in the DR planning process are the ____ provided by the Federal Agency Security Practices (FASP) section of NIST's Computer Security Resource Center (CSRC).

A. contingency plan templates
B. description documents
C. standards documents
D. IT blueprints


Answer: A

Trades & Technology

You might also like to view...

Jerry has 280 steers for which he developed a balanced ration of 16 percent CP with an energy goal of 1,500 Kcal/lb. (Note: 2,000 Kcal = 100 percent TDN.) The feedstuff in Table 13-1 will be provided to balance the ration.


How many pounds of each feedstuff were needed to make 100 pounds of a balanced ration

Trades & Technology

The relationship between work and time is known as power

Indicate whether the statement is true or false.

Trades & Technology

Cells and other voltage sources are often connected in series to obtain ____ voltages.

a. lower b. similar c. higher d. grounded

Trades & Technology

How is recovering into a receiver accomplished?

A) The Schrader valves are replaced with receiving hoses. B) A plastic recovery device is emptied into a receiver. C) The refrigerant is pumped into the receiver with the king valve closed D) A receiver is placed over a tube after it has been pierced.

Trades & Technology