Capacitors wired in series with the starting winding provide ____.
A. longer starting time
B. greater starting torque
C. an aid in starting three phase motors
D. more efficient operation at full load speed
Answer: B
You might also like to view...
The shop drawings are prepared by the
A) structural engineer. B) MEP engineer. C) architect. D) all of the above. E) none of the above.
The process of weathering or eroding the hard coat of a seed so that moisture can enter is known as _____________________
Fill in the blank(s) with correct word
Technician A says Toyota HEVs use primarily hydraulic power steering systems. Technician B says that all Toyota HEVs use a master warning indicator light on the driver information center to alert the driver of a vehicle problem. Which technician is correct?
A) Technician A B) Technician B C) Both technicians D) Neither technician
A single construction permit usually covers all aspects of construction, including structural, mechanical, plumbing, and electrical work.
Answer the following statement true (T) or false (F)