The EPA requires contractors to obtain a stormwater permit for any project that will disturb the soil in an area of _____.
a. 1 acre or more
b. less than 5 acres
c. 5 acres or more
d. more than 10 acres
a. 1 acre or more
You might also like to view...
Describe your state’s transportation infrastructure. Include both passenger and freight transportation.
What will be an ideal response?
As a liquid, CO2 sold in steel drums and tankers is most commonly used as an ingredient in soft drinks, where it produces the "fizz."
Indicate whether the statement is true or false
Technician A says that the powertrain control module (PCM) or controller can control the voltage to the motor(s) in a hybrid electric vehicle. Technician B says that the PCM or controller can control the electric motors by varying the frequency of the applied current. Which technician is correct?
A) Technician A only B) Technician B only C) Both Technicians A and B D) Neither Technician A nor B
________ is about twice as fast as P-MOS
Fill in the blank(s) with correct word