If a technician on average can make 4 calls per day and assuming a 20-day work month, what is the largest number of trucks and technicians that are needed by Suburban-X? Round the answer up to the nearest whole number.
Fill in the blank(s) with the appropriate word(s).
Answer: 5
You might also like to view...
Each patient bed location in a healthcare facility must be supplied by _____.
a. one circuit from the emergency system only b. one circuit from the normal electrical system only c. at least two branch circuits from the emergency system d. one or more circuits from the normal electrical system and one or more from the emergency system
What could cause corrosion of a stainless steel ice-maker?
A) Water with too much alkaline content B) Water with a pH above 7 or not enough chlorine gas in the water supply C) Acidic water or too much chlorine gas in the water supply D) Unfiltered water with too much air in the supply line
Which parts of a development are true size and true shape?
What will be an ideal response?
Materials can be separated into four general classes on the basis of their permeance. One class, vapor semi-permeable, means ____.
A. 0.1 perm or less B. greater than 0.1 perm and less than 1.0 perm C. greater than 1.0 perm and less than 10.0 perms D. greater than 10.0 perm