Which of the following is NOT a correct way to Add a calculated control to a form or report?
A) Use the Expression Builder
B) Create a formula in an unbound control
C) Create a formula beginning with the equal sign (=) in a text box
D) Create a formula in a bound control
D
You might also like to view...
In the following function prototype, how many parameter variables does this function have?
int myFunction(double, double, double); a. 1 b. 2 c. 3 d. cannot tell from the prototype
Each memory location inside a computer can hold only one item of data at a time.
Answer the following statement true (T) or false (F)
As the needs of the system are identified by the employees, the developer must design a database that will meet these needs using ________ database principles
Fill in the blank(s) with correct word
Discuss the difference between using a two-variable data table and calculating elasticity when analyzing costs
What will be an ideal response?