Currently, the two primary methods of fastening together the major components of a steel-frame structure are _______________ and _______________.

Fill in the blank(s) with the appropriate word(s).


Currently, the two primary methods of fastening together the major components of a steel-frame structure are bolting and welding.

Trades & Technology

You might also like to view...

Assume that the two circuits in Fig.19.135 are equivalent. The parameters of the two circuits must be equal. Using this factor and the z parameters, derive Eqs.(9.67) and (9.68).

Trades & Technology

Units in the SI measurement system are subdivided into:

A) Units divisible by 2. B) Common fractional quantities. C) Units of 10. D) Units divisible by 3.

Trades & Technology

This roof is a very common style of roof in areas with little rain or snow, and is economical to construct because ceiling joists are eliminated and rafters are used to support both the roof and ceiling loads:

A. flat B. shed C. gable D. hip E. gambrel

Trades & Technology

An insulated grounded conductor of _____ AWG or smaller shall be identified by a continuous white or gray outer finish, or by three continuous white or gray stripes along its entire length on other than green insulation.

What will be an ideal response?

Trades & Technology