The equipment used in cut-and-fill operations depends mostly on the ____ of the project.
A. scale
B. region
C. code requirements
D. timeline
Answer: A
You might also like to view...
The three phases of diesel ignition include _______
A) Glow plug ignition, ignition delay, controlled combustion B) Ignition delay, rapid combustion, controlled combustion C) Glow plug ignition, fast burn, slow burn D) Slow burn, fast burn, slow burn
An advantage of plastic erasers over rubber erasers is that they can be ____________________ to remove the graphite
Fill in the blank(s) with correct word
Two technicians are discussing the operation of a dual master cylinder. Technician A says that the pedal push rod contacts the primary piston. Technician B says that the secondary piston is pushed forward by the fluid trapped ahead of the primary piston. Which technician is correct?
A) Technician A only B) Technician B only C) Both technicians D) Neither technician
What is the standard airflow across the evaporator of a 3-ton residential split-system air conditioner?
A) 1,200 CFM B) 800 CFM C) 1,000 CFM D) 1,500 CFM