One requirement for a right-to-know program is employee accessibility to the ____________________, which states the chemicals used on a project and any harmful effects they may cause.
Fill in the blank(s) with the appropriate word(s).
MSDS
You might also like to view...
The maximum pull that should be exerted on cables being pulled in tray when using a basket grip is _____.
a. 500 pounds b. 750 pounds c. 1,000 pounds d. 1,200 pounds
The topsoil in Problem 27 is to be removed with a bulldozer. The estimated productivity is 22 bcy per hour and it will take two hours to mobilize the bulldozer. The total ownership and operation cost of the bulldozer is $42.56 per hour and the cost of an operator is $22.14 per hour. Determine the number of hours and the cost to strip the topsoil.
What will be an ideal response?
Tall safety stands would be used to _______
A) Help support the vehicle when a major component is removed from the vehicle B) Lift a vehicle C) Lift a component such as an engine high off the ground D) Both B and C
Engineers used to use pendulums to measure the value of g at a location. The formula to use the measure the acceleration due to gravity is