Briefly describe when and how footings are shown on elevations:

What will be an ideal response?


If the structure is built on a level lot, the line of the footing is usually omitted. On a sloping job site, the line of footing can help the foundation crew visualize the grading required to place the foundation.

Trades & Technology

You might also like to view...

If possible, an interiorscaper should organize the plant order to arrive about ____ prior to installation

a. one or two days c. five or six days b. three or four days d. one or two weeks

Trades & Technology

The    control valve utilizes a diverter valve that, when activated, will control one group of cylinders or the other.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

Troubleshooting Walk-In / Low Temp - Diagnosis: Evaporator is frozen Check defrost components

Trades & Technology

Technician A checks the oil level before performing an oil change. Technician B checks the oil after the oil has been changed. Who is correct?

A. A only B. B only C. Both A and B D. Neither A nor B

Trades & Technology