Briefly describe when and how footings are shown on elevations:
What will be an ideal response?
If the structure is built on a level lot, the line of the footing is usually omitted. On a sloping job site, the line of footing can help the foundation crew visualize the grading required to place the foundation.
You might also like to view...
If possible, an interiorscaper should organize the plant order to arrive about ____ prior to installation
a. one or two days c. five or six days b. three or four days d. one or two weeks
The control valve utilizes a diverter valve that, when activated, will control one group of cylinders or the other.
Fill in the blank(s) with the appropriate word(s).
Troubleshooting Walk-In / Low Temp - Diagnosis: Evaporator is frozen Check defrost components
Technician A checks the oil level before performing an oil change. Technician B checks the oil after the oil has been changed. Who is correct?
A. A only B. B only C. Both A and B D. Neither A nor B