Explain the purpose of reviewing shop drawings and submittals.

What will be an ideal response?


By reviewing the shop drawings and submittals, the contractor will become aware of the means and methods of installing the construction materials, systems, and assemblies. When installing the material and equipment with their own forces, the contractor will use the submittals to determine the necessary equipment and workforce to construct the assembly. Although the contractor should have determined a plan for installation during the estimating phase, a detailed examination of the procedures is necessary during the construction phase. The information in the submittal should indicate the size, weight, configuration, and installation details of the material and equipment. It is possible that the particular material is not compatible with the construction methods intended for use on the project, requiring either a different material or different construction methods.

Trades & Technology

You might also like to view...

Maximum torque is developed when the ____________________ of the stator and rotor are in-phase with each other.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology

____________________ dairy goats tend to be smaller than other breeds

Fill in the blank(s) with correct word

Trades & Technology

The fact that epinephrine has no apparent effect on energy consumption unless thyroid hormones are present in normal concentrations is an example of a(n)

A) antagonistic effect. B) synergistic effect. C) permissive effect. D) opposing effect. E) integrative effect.

Trades & Technology

The furnace has one or more broken heating elements or one or more fusible links open. What should the technician do?

A) The technician should check the power source to the furnace. B) The technician should check the furnace airflow. C) The technician should replace all the fusible links. D) The technician should replace all the heating elements.

Trades & Technology