Control joints should be cut into concrete slabs between 4 and 12 hours after concrete placement using a

_____.

a. steel trowel
b. dry-cut saw blade
c. wet-cut saw blade
d. jointing chisel


c

Trades & Technology

You might also like to view...

When planning or diagramming a floor-mounted transformer supplying a power panelboard, what are important components to include?

What will be an ideal response?

Trades & Technology

When a single or base color of paint is needed, ____ painting is optimal if the part is withdrawn from the paint slowly.   ?

A. ?screen  B. ?spray C. ?electrostatic  D. ?dip

Trades & Technology

What is the difference between sensible and latent heat?

What will be an ideal response?

Trades & Technology

The flow rate that oil is fed to the burner is rated in __________.

A. gallons per hour B. gallons per minute C. ounces per hour D. ounces per minute

Trades & Technology