?
The _______________ are the base of reference for determining responsibility and liability for actions by owner and contractor during the project period.

A. Technical Specification
B. Conditions of the Contract
C. Bid Forms
D. Instructions to Bidders


Answer: B

Trades & Technology

You might also like to view...

Design should avoid extreme brightness in the field of vision. How might this be accomplished in street lighting?

A) General diffuse distribution. B) Asymmetrical distribution. C) Low Intensity Discharge (LID) lamps.

Trades & Technology

Sheep and goats routinely have multiple offspring per pregnancy.

Answer the following statement true (T) or false (F)

Trades & Technology

All of these are OBD-II requirements EXCEPT ________

A) Alert the driver of necessary emission-related repairs or service B) Use standardized DTCs and accept a generic scan tool C) Tell the technician what is wrong with the engine D) Detect component degradation or faulty emission control operation

Trades & Technology

As the outside air temperature drops, the heating efficiency of air to air heat pumps

A) Remains the same B) Decreases C) Increases D) Is unpredictable

Trades & Technology