Doubled top plates are required in SIP construction. The end joints in top plates must be offset by a minimum of ________ inches

A) 6 B) 18 C) 12 D) 24


D

Trades & Technology

You might also like to view...

Approximately how many AIDS cases are diagnosed each year in the United States among men?

A) 10,000 B) 33,000 C) 1,000,000 D) 750,000

Trades & Technology

Which is the best approach to conflict resolution?

a. Avoid conflict b. Compromise c. Collaboration d. None of the above

Trades & Technology

In steel erection, written authorization must notify the steel erection contractor that concrete used in footings has withered:

A. Cured to at least 75% of its intended minimum compressive design strength. B. Has cured sufficiently to support the loads that will be imposed during erection. C. Both A and B.

Trades & Technology

If a 5,000,000 circular mil cable is composed of 37 strands of copper wire of equal size. What is the approximate diameter of one strand? Carry the answer to two decimal places.

Fill in the blank(s) with the appropriate word(s).

Trades & Technology