In the instructions to the B101-2007 Document, what are the four methods to compute compensation for architectural services that are based on cost and time?
What will be an ideal response?
The four methods to compute compensation based on cost and time are (1)
multiple of direct salary expense, (2) multiple of direct personnel expense,
(3) professional fee plus expenses, and (4) hourly billing rates.
You might also like to view...
Technician A says that a DD axial power turbine (APT) uses a constant geometry (CG) turbine principle. Technician B says that DDC claim their APT can add over 100 horsepower to engine output potential. Who is correct?
A. Technician A only B. Technician B only C. Both A and B D. Neither A nor B
What are 3 installation related ice machine problems a service tech must check?
a. Ice machine location, drainage, and water supply. b. Water quality, ice machine type, and ice machine size. c. Ambient conditions, water supply, and customer’s ice needs.
A module is also known as a ________
A) BUS B) Node C) Resistor pack D) Terminator
While considered to be a durable material, ____ siding is susceptible to damage from severe cold or heat, heavy wind, and even melting from sunlight reflecting off low SHGC windows.
A. aluminum B. EIFS C. fiberglass D. vinyl