All joints, seams, penetrations, site-built windows, doors, skylights, utility penetrations, and attic access openings are examples of ________

A) Areas which require placement of a heat recovery ventilator
B) Areas where vapor retarders are required by the IRC
C) Areas in which it is important to have air sealing
D) Areas which require a Grade 1 Insulation Installation


C

Trades & Technology

You might also like to view...

Larvae are usually conservative eaters and eat only after metamorphosis

Indicate whether the statement is true or false

Trades & Technology

Theodore Roosevelt is sometimes called the "first modern president." Interpret this phrase and explain how it fits Roosevelt's conduct of the office.

What will be an ideal response?

Trades & Technology

The 1's-complement of the binary number 0101101012 is:

A) 011001010 B) 101001010 C) 101001000 D) 101110101

Trades & Technology

These views are used to show the true size and shape of a surface that is not parallel to any of the six principal views.

A. Auxiliary views B. Sectional view C. Front view D. Side view E. none of the above

Trades & Technology