________ are 2 × 4 or 2 × 6 dimensional or engineered lumber boards placed across the ceiling joists and nailed to the sides of rafters
A) Wood splice plates B) Stub joists C) Rafter ties D) Strongbacks
C
Trades & Technology
You might also like to view...
A _______________ will not allow a process or equipment to startup unless certain conditions are met.
Fill in the blank(s) with the appropriate word(s).
Trades & Technology
What tools are used to hold tubing and to form a flared end?
What will be an ideal response?
Trades & Technology
Wildlife managers today spend just as much time on the job working with people as they do working with wildlife and their habitat
Indicate whether the statement is true or false
Trades & Technology
____ diodes can be connected to form a three-phase bridge rectifier that will change three-phase AC voltage into DC voltage.
A. Two B. Three C. Four D. Six
Trades & Technology